During Shao Shan Temple's "Maintenance Week Break" (July 1-8)
a number of improvements were made to the Temple
- The floor of the kitchen/study are was sanded and painted with 4 coats of polyurethane
- Bathroom walls were sanded, primed and painted (these walls had never been painted!)
- Kitchen counter was redone
- Kitchen/study walls were repainted
- Temple front deck was stained
- Kitchen cupboard was repainted (take a look inside!)
- All the trim and wainscoting in kitchen/study had a fresh coat of poly
- Tables and cupboards and shelves got fresh coats of paint or poly
- The rear entrance floor and the floor under the kitchen counter were painted
Temple Kitchen/Study room with furniture cleared out and fresh coat of poly |
Public programs resumed in the clean sparkly space on July 9th!